Case Study

Large Plant Case Study Large Plant Case Study Large Plant Case Study

Large Plant

 

Guaranteed Flow Systems use fully experienced welders qualified to the highest standards (ASME IX, API 1104, AS 2980) in both carbon steel and stainless steel capabilities for all aspects of pipelines from the smallest diameter to 1200 mm or more.

 

PROJECT OVERVIEW

 

Size does matter, and we have the skills and ability to be able to take on any size.

Fabricate in our own workshops, 1200mm NB diameter headers formed part of the large scale project recently undertaken to manufacture new headers, wye pieces and 1200 NB inlet connections.

Not stopping there we undertook excavation and sheet piling work around the site, installed new separators and completed the full ‘cut-ins’ into the raw water supply lines during a scheduled 36 hour time window.

All done and done well.


Latest Case Studies

Leak Repairs

Underground water transmission repairs





Waste Water

Hot Tapping

Guaranteed Flow Systems has developed an innovative procedure which allows for the installation of branch connections to live pressure mains.


Water

Modular Water Treatment Plant

The scope of this project was to supply and install a temporary membrane filtration unit to a bore water supply to remove manganese and iron. Designed to treat a flow of 5,200 m3 / day.

Water

 Subscribe to stay in the loop




 

Get in touch

map-marker

Address

8 Averton Place, East Tamaki, Auckland 2013, New Zealand PO Box 259194 Botany

mobile

Phone

+64 9 272 3496

mobile

Email

info@gfsystems.co.nz